The bill of materials becomes material on the move
The bill of materials raises the requisition — available material moves to the workshop now, the shortfall is procured, and both arrive as one inflow.
A workshop waiting for the last item on the list
The job is sold, the bill of materials exists — and the workshop is idle.
The gap between a finished bill of materials and material actually moving is where solution timelines quietly die.
Available material moves now; the shortfall is procured in parallel
The requisition is raised from the bill of materials itself — nobody retypes a component list.
Available today
moves on a delivery note immediatelyShort today
pending from requisition, procured in parallelOne inflow to the workshop
Both routes arrive the same way, so the workshop never has to know which was which.
Production starts with what exists, and the record — not a man's memory — carries what is still owed.
The internal gap closes; the supplier's delay stays honest
Stated plainly: the software closes your gap — the days lost to gathering, chasing and walking the godown.
It cannot manufacture a supplier's stock, and no internal system can predict a supplier's delay.
What it does instead is make the shortfall a recorded, procured, trackable fact from day one — so the wait, where there is one, is known and watched rather than discovered.
Your own gap — the days that vanish before a single panel is cut
The shortfall is recorded — from day one, not from the day somebody asks
Procured and trackable — so the wait is watched rather than discovered
Manufacture a supplier's stock — no system can, and none should claim to
Predict a supplier's delay — the delay stays honest, and stays visible
Turn Thursday into Tuesday — it only stops Thursday being a surprise
The workshop reads the job, not a photocopy
What arrives with the material is the job itself: the last finalised estimate, its bill of materials, its drawings — bound to the same revision, with superseded versions unreachable.
Every requisition leaves a stamp
Raised, delivered, pending, procured, received, delivered again — each step recorded with who and when.
The act itself makes the stamp.
The kit assembles itself on record
The list stops being paper.
Available material moves the day the order succeeds; the shortfall chases itself through procurement; and the workshop starts working instead of waiting.
Raise one requisition from a real bill of materials, and watch the kit assemble on record.
Ask for a demo