One sale, many components, fulfilled as one job
One kitchen order, many components. Estimate, bill of materials and drawings stay one decision — production, fabricators and fitters read the same job.
Five good teams, and the decision that did not travel
A kitchen order crosses five teams before the customer signs: design, sales, the backend that procures and coordinates, production, installation.
Nobody in that list is incompetent. The job still went wrong, because what one team knew never reached the next. A decision existed, somewhere — and did not travel.
The estimate missed components
Because the person building it worked from memory.
Procurement ran late
And stalled the workshop waiting on material.
Production used a superseded drawing
A decision changed, and nobody marked it.
The fitters arrived without drawings
At the customer's house, with nothing to work from.
From the yes to the signature, one connected chain
A solution order runs as one job from the moment it is confirmed:
Each link of that chain has its own page. This page's argument is what holds them together: every team works on the same job, reading the same estimate, the same bill of materials, the same drawings — not their own copy of any of them.
The wrong version is unreachable
Here is the discipline that saves solution businesses real money.
The estimate and its bill of materials are one document with two faces — revise the estimate, and the bill of materials revises with it, automatically. Only a succeeded order proceeds to requisition, and by then only the live version exists.
Drawings follow the same law. Every revision must carry its revised drawing. Superseded drawings blur exactly as superseded estimates do.
The attachment travels with the order, so the workshop and the site crew consult it whenever they want.
A rule somebody must remember — on the day it matters, under pressure
And it costs a full run of material — when the rule is the thing that fails
One document, two faces — revise the estimate and the bill of materials revises with it
Drawings follow the same law — every revision carries its revised drawing
They cannot drift apart — because they came from the same revision
No workshop of your own is no barrier
A large share of kitchen, wardrobe and aluminium businesses own no workshop — the fabrication is outside.
Outside fabricators join the platform as team members: they receive the delivery notes, record production status, and mark final goods, exactly as an in-house workshop would.
You can walk over and look — which is the easy case
You were phoning to ask — and taking his word for it
Now he is a team member — receiving delivery notes, recording status, marking final goods
You read the status he recorded — exactly as an in-house workshop would leave it
Now you read the status he recorded instead.
The signature at handover is the moment that matters
The chain ends with a structured feedback form — ratings on parameters you configure, remarks, and a signature taken on the phone.
For a bespoke product fitted in a customer's home, with the balance payment riding on satisfaction, that signed acceptance is worth more than everything upstream of it.
Every link leaves a stamp
Requisition, delivery note, production, dispatch, installation, sign-off — each recorded with who and when, images at the stages where images settle arguments.
Bring one kitchen order — estimate to installation — and watch every decision travel with it.
Ask for a demo